Old Matanuska Housing Development Phase II PUR-102 Inspections
RFQ# 23T-DV-308
On behalf of Old Mat Phase II Limited Partnership, Cook Inlet Housing Authority (CIHA) is seeking quotes from responsive and responsible firms for the Old Matanuska Housing Development PH II PUR 102 Inspections. The project site is at the parcel located at Section 18, Township 17N, Range 1E, Lot B5 in Wasilla, Alaska.
For a total of six (6) 4-plex buildings, provide all labor, materials, equipment, and administration to conduct a minimum of five (5) PUR-102 inspections per building (more may be required, depending on construction methods used) and complete an Alaska Housing Finance Corporation (AHFC) Form PUR-102, Summary of Building Inspections for each inspection on each building. At a minimum, inspections shall include: 1) Plan Approval (prior to construction start); 2) Footings and foundation; 3) Rough-in inspections; 4) Insulation and vapor barrier; 5) Final approval. Only an authorized inspector meeting AHFC’s criteria may perform the required inspections and complete the AHFC Form PUR-102. See attached “AHFC New Construction Inspection Guidelines” for more detailed information regarding the inspection guidelines/requirements. Firms are responsible to verify the Scope of Work assigned to this discipline.
Construction is anticipated to start on July 01, 2023. CIHA expects the project to be completed by August 30, 2024.
Specified Dates
RFQ Packet Available March 31, 2023, 2:00 p.m. CIHA Website
Last Day for Questions April 13, 2023, 4:00 p.m. via email
Quote Due Date April 27, 2023, 4:00 p.m. via email or mail
This Request for Quote is not to be construed as a commitment of any kind nor does it commit CIHA to pay for any cost incurred in the submission of a quote or any other incurred costs prior to the execution of a contract.
Published March 31, 2023 through April 27, 2023 at www.cookinlethousing.org.
REQUEST FOR QUOTE
RFQ#23P-DV-308 Old Matanuska Housing Development Ph II PUR-102 Inspections
DRAWINGS
Old Mat Townhouse Deve- Ph II Unit Group 1A/1B Permit Documents (2.10.2023)
Old Mat Townhouse Deve- Ph II Unit Group 2A/2B/2C/2D Permit Documents (2.10.2023)
ATTACHMENTS
Attachment “A”- AHFC New Construction Inspection Guidelines (March 2020)